People in Patna have been waiting for the metro for a long time. Now it will start soon for everyone. People are excited to see it run on the elevated track. Soon, it will give a new travel experience to the people of the city. The first three stations are being finished, and daily trials of the metro are happening. During these trials, the train’s speed, lights, and safety are being checked to make sure the ride is safe and comfortable. The Patna Metro will make travel in the city easier and save time.
Officials say people in Patna will be able to ride the metro by Navratri. It will make daily travel easier and give a new modern transport experience to the city.
Metro Trials and Preparations
The metro is being tested to get the stations and tracks ready. Entry and exit points, lights, and other equipment are being set up at the stations. During the trial, the train ran from the depot to Bhootnath Road and worked well. The metro depot in Bairia, which is 76 acres, is almost ready.
Tickets, Fares, and Operations
The metro fare is fixed. The minimum ticket is Rs 15 for a short trip. The maximum ticket is Rs 30 for a long trip. For example, New ISBT to Zero Mile costs Rs 15. New ISBT to Bhootnath costs Rs 30. In the future, fares may go up a little when the metro goes to Malahi Pakadi.
The metro will run about 14–15 hours every day. One trip will take about 20 minutes. The final timing will be told to the public soon.
Faster and Easier Travel
Patna Metro will make travel in the city faster and easier. It will reduce traffic, save time, and give a safe ride. The trials show that the city will soon enjoy the metro.

